Construction dust pollution, Voskerichner street 1
The agency repliedSubmitted on July 21, 2026
Destination: Active Citizen (Yerevan Municipality)
Tracking ID: 119111
Materials
Below is the author's own text. We publish it as filed, without edits to wording or spelling.
Летит пыль от стройки у меридианаYerevan MunicipalityJuly 29, 2026
- Permitted
- Admits the problem
- Rated acceptable
- Action against a third party
Status History
At Active Citizen (Yerevan Municipality)
- July 29, 2026
- Response received10:20Field worker 1
- Operator's response10:17
Dear Citizen, we inform you that as a result of the on-site inspection and study, it has been found that construction works at 1 Voskerichneri Street are being carried out in accordance with the relevant construction permits issued by the Yerevan Municipality on 29.01.2026. Simultaneously, it is informed that during the on-site inspection, asphalt paving, preparation for asphalt paving works, and area leveling works were being carried out, and the existing piles of crushed stone are used during leveling works and, after being emptied, are spread in the area as a preliminary layer for asphalt in the shortest possible time. The developer regularly carries out cleaning and moistening works of the area to exclude the presence of dust as much as possible, and the developer of the mentioned area has been warned about the need to observe coexistence rules.
- July 23, 2026
- Picked up by the addressee16:10Field worker 1
- Accepted. Response due by 07/28/2026, 23:59
Yerevan for People review
Picked up for review