Skip to main content- Submitted total
- 487
- Forwarded
- 464
- Accepted
- 455
- Answered
- 297
- Public
- 433
Sidewalk on Nikita Simonyan street cleared of overgrown branches
Trash bins at Khanjyan Street 19 removed and relocated, sanitary cleaning carried out
Sanitary cleaning works carried out at sports ground
Art. 124 § 27, fine AMD 20,000
Issue of large stones on pedestrian crossing resolved, sanitary cleaning works carried out
Sanitary cleaning works carried out at the address to remove small debris
Art. 124 § 21, fine AMD 5,000
Sanitary cleaning works carried out at Paruyr Sevak street 5
Broken flexible bollards at Mesrop Mashtots Avenue 8/4 have been replaced
Sanitary cleaning works carried out at Mesrop Mashtots Avenue 4
Public transport stop markings restored at Charents street 1b
Deep crack or pit near bus stop pavilion at Azatutyan Avenue 1 has been repaired
Lighting on overpass at Arshakunyats Avenue 37/9 was inspected and adjusted
Playground equipment repaired, slide replaced
Traffic-restricting barriers installed in the section adjacent to Zakian street 5/5
Area asphalted and stroller ramp at Aram Street 2 is now accessible
Work area fenced with yellow barriers, pedestrian passage not obstructed
Burnt-out luminaires replaced at Kievyan street 2
Asphalt paving works on Demirchyan-Baghramyan road section have been completed
Water leak from wall at Nar-Dos 61 rectified, pipeline repair confirmed
Manhole cover secured
Pile of dry branches and litter removed from grassy area at Arshakuniats Avenue
Area at Babayan 16 has been cleaned
Glass recycling container and other recycling bins at Movses Khorenatsi 11 serviced