Skip to main content- Submitted total
- 487
- Forwarded
- 464
- Accepted
- 456
- Answered
- 297
- Public
- 433
Sidewalk on Nikita Simonyan street cleared of overgrown branches
Trash bins at Khanjyan Street 19 removed and relocated, sanitary cleaning carried out
Sanitary cleaning works carried out at sports ground
Art. 124 § 27, fine AMD 20,000
Issue of large stones on pedestrian crossing resolved, sanitary cleaning works carried out
Sanitary cleaning works carried out at the address to remove small debris
Art. 124 § 21, fine AMD 5,000
Sanitary cleaning works carried out at Paruyr Sevak street 5
Broken flexible bollards at Mesrop Mashtots Avenue 8/4 have been replaced
Sanitary cleaning works carried out at Mesrop Mashtots Avenue 4
Public transport stop markings restored at Charents street 1b
Deep crack or pit near bus stop pavilion at Azatutyan Avenue 1 has been repaired
Lighting on overpass at Arshakunyats Avenue 37/9 was inspected and adjusted
Playground equipment repaired, slide replaced
Traffic-restricting barriers installed in the section adjacent to Zakian street 5/5
Area asphalted and stroller ramp at Aram Street 2 is now accessible
Work area fenced with yellow barriers, pedestrian passage not obstructed
Burnt-out luminaires replaced at Kievyan street 2
Asphalt paving works on Demirchyan-Baghramyan road section have been completed
Water leak from wall at Nar-Dos 61 rectified, pipeline repair confirmed
Manhole cover secured
Pile of dry branches and litter removed from grassy area at Arshakuniats Avenue
Area at Babayan 16 has been cleaned
Glass recycling container and other recycling bins at Movses Khorenatsi 11 serviced
Plastic bottles and other trash removed from unpaved area
Garbage removed from sidewalk at Arshakuniats Avenue 1st Lane 28/1
Trash can installed near establishment at Vahagn Davtian street 2nd lane, 10
Cleaning works carried out at the address specified by the citizen
Traffic light operation restored
Bulky waste removed from sidewalk at Aram Khachatryan street 9/1
The pedestrian crossing markings at Vratsakan Street 5 have been restored
Public transport stop markings at Pavstos Buzand Street 107 have been applied
Public transport stop road markings installed at Karapet Ulnetsi street 141
Grass burning stopped, area brought to proper condition
Discarded upholstered furniture and large waste removed from Arshakunyats Avenue sidewalk
Accumulated trash has been removed
Waste collection and sanitary cleaning performed near "Titan" supermarket
Overflowing trash bins and accumulated garbage at Arshakunyats Avenue 28/1 have been cleared
Underpass at Mashtots Avenue 4 underwent sanitary cleaning and washing
Art. 124 § 27, fine AMD 20,000
Road sign replaced, new clearly visible speed bump warning sign installed
External lighting network inspected, burnt-out luminaire replaced with a new one
Street light at Arshakuniats Avenue 11 repaired
Electric lamp and cables removed from children's park tree
The issue of the black cable found on dry grass in the park has been eliminated
The broken bench in the children's park at Zakyan 13 has been repaired
The reported small ground fire at Arshakunyats Avenue 5/7 has been extinguished
Public transport stop markings applied at Vahram Papazyan 22/3