Submitted more than 30 days ago with no decision yet, from the agency or from us. Oldest first.
Road in poor condition, Ptghni village, 2nd quarter, 12th garden area
The agency has taken it up
Still waiting after 156 days
Man with artificially dyed pigeons for photos, Severny Avenue 2
Still waiting after 151 days
Sidewalk covered with garbage, Nikoghayos Adonts street 2
Still waiting after 114 days
Accumulation of garbage under concrete structure, Pavstos Buzand street 45/2
The agency has not finished
Still waiting after 93 days
Dislodged manhole cover, Arshakunyats Avenue 24/1
Still waiting after 84 days
A pile of worn-out tires is blocking the pedestrian passage at Arshakunyats 214
Still waiting after 80 days
Water flowing heavily down steps, Kashegortsner street 187/1
Still waiting after 79 days
Bulky waste, Hayrik Muradyan street 3
Still waiting after 78 days
Bulky waste, Aram Khachatryan street 5
Bulky waste, Aram Khachatryan street 13
Bulky waste accumulation, Hrazdan Riverbank Road 155
Bulky waste, Vahram Papazyan street 32
Bulky waste, Aram Khachatryan street 24
Bulky waste, Aram Khachatryan street 27
Hazardous metal ring, Arshakunyats Avenue 18/11
Still waiting after 76 days
Damaged asphalt road surface, Arshakuniats Avenue 1st Lane 14
Still waiting after 74 days
Accumulated garbage near trash bins, Zakian street 1st lane 1
Exposed wire on the curb, Movses Khorenatsi Street 6/15
Still waiting after 72 days
Illegally dumped refuse, Griboyedov street 48/5
Still waiting after 70 days
Dangerous pavement at Sayat-Nova — Khanjyan stop, Sayat-Nova Avenue 26/4
Still waiting after 67 days
Unsafely closed manhole, Ter-Grigorian street 5/1
Still waiting after 66 days
Pothole on the asphalt, Zakian street 2
Exposed electrical wire, Arshakuniats Avenue 16/2
Accumulation of garbage, Griboyedov street 48/5
Still waiting after 65 days