Sanitation work was carried out at the address you indicated on 17.11.2026.
The closure works have been carried out.
The traffic light is operational again.
Sanitary cleaning works were carried out at the specified address on 11.11.2026.
Sanitary cleaning works were carried out at the address indicated by you on 12.11.2026.
Sanitary cleaning of the area at the address you indicated was carried out on 11/14/2026.
The stands have been removed from the indicated address.
Sanitation work was carried out at Azatutyan Avenue 2A on 11.11.2026.
At the address indicated by you, on 11.10.2026, works were carried out to inspect the external lighting network and replace burnt-out luminaires with new ones.
The bollards have been removed from the address you specified.
At the specified address, sanitary cleaning works were carried out on 09.11.2026.
At Saryan Street 24A, cable arrangement and dismantling works were carried out on 26.11.12.
At the specified address, sanitary cleaning works were carried out on 09.11.2026.
The work of removing the irons and tape from the specified area has been carried out.
The work of removing iron rods from the lawn in the section you indicated has been carried out.
The posters from the section you indicated have been removed.
At the specified address, sanitary cleaning works were carried out on 09.11.2026.
The specified section has been asphalted.
The traffic light is operational again.
The movable stands placed in front of the "Vardanants" Medical Center have been removed from the area.
The signs have been replaced.
Sanitary cleaning works were carried out at the address indicated by you on 07.11.2026.
Sanitary cleaning works were carried out at the address indicated by you on 11.10.2026.
According to information provided by the servicing organization, the traffic light operation has been restored.
Cleaning works have been carried out in the section you indicated.
The given section has been opened.
Sanitary cleaning works were carried out at the address you specified on 11/10/2026.
On 11.11.26, at Arshakunyat Avenue 1st Lane, building 30, inspection and accident recovery works were carried out on the external lighting network.
Sanitation works were performed at 18 Vagharshyan Street on 09.11.2026.
The specified area has been cleaned.
The metal structures located at 12 Hrachya Kochar Street have been evacuated and removed from the area. The area is currently in a clean condition.
Sanitary cleaning works were carried out at the address you specified on 11.10.2026.
Sanitary cleaning works were carried out at the address indicated by you on 11/05/2026.
Sanitary cleaning works were carried out at the address you specified on 11.10.2026.
Waste removal and sanitary cleaning works were carried out at the address you indicated by the EASU municipal institution on 08.11.2026.
Sanitation works were performed in the area specified by you on 09.11.26 and 11.12.26.
On 05.11.2026, at the address you indicated, works were performed to inspect the external lighting network and replace a burnt-out luminaire with a new one.
The illegally installed parking barriers at Komitas Avenue 44 have been dismantled and removed from the location.
We hereby inform you that on November 5, 2026, sanitation works were carried out at the premises located at 57 Baghramyan Avenue.
The boxes have been removed from the address you indicated.
The stand has been removed from the address you specified.
Sanitation work was carried out at the specified address on 07.11.2026.
At Arshakunyats Avenue, 1st Lane, the existing tires, metal bars, and chains were dismantled.
Sanitary cleaning works were carried out at the address indicated by you on 05.11.2026.
On 05.11.2026, sanitary cleaning works of the yard area were carried out at the address you specified.
We hereby inform you that sanitary cleaning works were carried out at the address you specified on 05.11.2026.
The violation has been rectified.
Sanitary cleaning works were carried out at the address you indicated on 03.11.2026.
The electric scooters parked on the specified sidewalk have been removed.
At the specified address, on 03.11.2026, sanitation works were carried out in the area.
At the specified address, on 03.11.2026, sanitation works were carried out in the area.
Sanitary cleaning works were carried out at the address you indicated on 03.11.2026.
The mobile stands have been removed by the department's employees.
Sanitary cleaning works were carried out in the area at the specified address on 03.11.2026.
The issue has been resolved.
Sanitation works were carried out at the указанный address on 02.11.2026.
Sanitary cleaning works were carried out at the specified address on November 3, 2026.
Sanitary cleaning works were carried out at the specified address on 02.11.2026.
On 05.11.2026, at the address you specified, work was carried out to inspect the external lighting network and replace the existing burnt-out luminaire with a new one.
The trunk of the mentioned tree has been removed.
Concreting works have been carried out in the section you indicated.
The stump at the specified address has been removed.
Sanitary cleaning works were carried out in the area at the specified address on 11/03/2026.
Sanitary cleaning works were carried out at the address indicated by you on 03.11.2026.
We hereby inform you that sanitary cleaning works were carried out at the address indicated by you on 11/02/2026.
Sanitary cleaning works were carried out at the address you indicated on 02.11.2026.
Sanitary cleaning works were carried out at the address you indicated on 02.11.2026.
The abandoned billboards from the section you indicated have been removed.
Sanitary cleaning works were carried out at the address you specified on 06.11.2026.
On November 6, 2026, sanitary cleaning works were carried out in the area at the address you specified.
Sanitary cleaning works were carried out at the address indicated by you on 03.11.2026.
Sanitary cleaning works were carried out by you at the specified address on 02.11.2026.