Broken bollards, Azatutyan Avenue 2
Active Citizen · Assignee 1
Broken window frame and deteriorating wall, H. Tumanyan Street 10
Active Citizen · Assignee 1
Uncleaned sports ground, Babayan street 26/2
Active Citizen
Dear Citizen, we inform you that sanitary cleaning works were carried out at the address you specified on 17.09.2026. We add that the playgrounds are in normal condition.
Air pollution from toxic burning, B. Fanarjyan street 48/17
Inspectorate for Nature Protection and Mineral Resources
Minibus 4572 L dropping off passengers in the third lane, M. Mashtots Avenue 20
Ministry of Internal Affairs of the RA
Minibus 4572 L dropping off passengers in the third lane, M. Mashtots Avenue 20
Ministry of Internal Affairs of the RA
Need for a pedestrian crossing, A. Khachatryan St. 25
Yerevan Municipality
Need for pedestrian crossing marking or anti-parking bollards, H. Babayan Street 12
Active Citizen · Assignee 1
Playground in need of repair, Lepsius 1-st street 14
Active Citizen
Dear citizen, we inform you that appropriate measures are being taken to resolve the issue you presented. We will inform you additionally regarding the completion of the works.
Repair of bus stop pavilion, Azatutyan Avenue 1
Active Citizen
Dear Citizen, please be informed that the necessary fastening and repair works have been carried out in the mentioned section. Thank you for the application, your vigilance helps us to quickly identify existing problems.
Unmaintained sidewalk, Nikita Simonyan street
Active Citizen
Dear citizen, we inform you that the work on removing overgrown branches from the section you specified has been carried out.
Trash bins obstructing traffic, Khanjyan street 19
Active Citizen
Dear citizen, we inform you that at the specified address, on 17.09.2026, waste removal and sanitary cleaning works were carried out. We also add that the waste bins have been removed from the roadway. Thank you for your cooperation.
Minibus 4572 L dropping off passengers in the third lane, M. Mashtots Avenue 20
Active Citizen
Minibus 4572 L dropping off passengers in the third lane, M. Mashtots Avenue 20
Active Citizen
Dear Citizen, traffic control is carried out by the Ministry of Internal Affairs of the Republic of Armenia, whose oversight is outside the functions of the Yerevan Municipality. Based on the above, to resolve the issue, you can contact the Ministry of Internal Affairs of the Republic of Armenia.
Dangerous metal structure with garbage, Garegin Nzhdeh St. 14
Yerevan Municipality
Dangerous metal structure with garbage, Garegin Nzhdeh St. 14
Yerevan Municipality
Dangerous metal structure with garbage, Garegin Nzhdeh St. 14
Active Citizen
Dear citizen, we inform you that the foundation of the structure located at the address you specified is very deep and voluminous, and in case of dismantling, the sidewalk and the street will be damaged, which is why dismantling is not expedient. We also add that its use as a flowerpot or for other purposes is being discussed, which will ensure safety.
Missing trash bins on playground, Lepsius 1-st street 12
Active Citizen
Dear Citizen, we inform you that the waste bin installation program for 2026 has been completed. In 2027, if a corresponding program is available, the address will be submitted for consideration. We also add that sanitary cleaning works were carried out at the specified address on 17.09.2026. Thank you for your cooperation.
Missing sidewalk section, Hyusisayin Charagayt Street 17
Active Citizen
Dear citizen, we inform you that no sidewalk improvement works are planned at the address you specified under the 2026 work program. At the same time, we inform you that this matter will be discussed should similar programs become available in the future.
Abundance of small debris, Lepsius 1-st street 12
Active Citizen
Dear citizen, please be informed that sanitary cleaning works were carried out at the address you specified on 17.09.2026. Thank you for your cooperation.
Missing sidewalk, A. Hekimyan Street 3
Active Citizen
Dear citizen, we inform you that no sidewalk improvement works are planned at the address you specified under the 2026 work program. We also inform you that your application will be taken into account should similar programs be available in the future.
Damaged sidewalk with protruding manhole, M. Yakobsen Street 9
Active Citizen
Dear citizen, please be informed that no sidewalk improvement works are planned at the address you specified in the Arabkir administrative district's 2026 work program. At the same time, we inform you that your application will be taken into account should similar programs become available in the future.
Need for playground cleaning, Vagharsh Vagharshyan street 24/1
Active Citizen
Dear citizen, we inform you that on 17.09.2026, sanitation works were carried out in the courtyard area at Vagharshyan street 24/1.
Neglected land plot, Yeznik Koghbatsi street 53
Active Citizen
Dear citizen, we inform you that the cleaning, excavation, backfilling, and lawn establishment works in the mentioned area have been completed. Thank you for your cooperation.
Lack of systematic watering for plants, Azatutyan Avenue 1/15
Active Citizen
Dear citizen, we inform you that appropriate measures are being taken to resolve the issue you presented. We will inform you additionally regarding the completion of the works.
Abundance of small debris, Azatutyan Avenue 1/15
Active Citizen
Dear citizen, we inform you that appropriate measures are being taken to resolve the issue you submitted. We will inform you additionally regarding the completion of the works.
Vanished raised pedestrian crossing, Aram Khachatryan Street 30
Yerevan Municipality
Bus route 62 did not stop at the bus stop, Babayan street 39/1
Active Citizen
Dear Citizen, we inform you that the operation of the minibus with license plate 5249T of route 62 has been monitored through the geolocation system, and it has been found that it was parked at the bus stop adjacent to 39/1 Babayan Street. Thank you for your cooperation.
Dangerous pit on the sidewalk, Admiral Isakov Avenue
Active Citizen
Dear citizen, we inform you that according to the relevant program of the staff of the head of Kentron administrative district, asphalt paving works exceeding 17,000 sq.m. were carried out in the administrative district in 2025. According to the relevant program for 2026, it is planned to repair 45,000 sq.m. of damaged asphalt-concrete pavement in the administrative district. At the same time, we inform you that after the completion of works in the previously inventoried and already planned areas, the issue of carrying out asphalt paving works at the address you indicated will be submitted for discussion.
Blocked pedestrian crossing, Azatutyan Avenue 17
Active Citizen
Dear Citizen, please be informed that the aforementioned pedestrian crossing has been closed due to safety considerations. At the same time, we inform you that it is not possible to organize a temporary alternative pedestrian crossing in the specified section. Approximately 50 meters upstream from the bridge, on Azatutyun Avenue, there is an overpass, which you may use as a temporary alternative. We also add that the major renovation works on the bridge are scheduled to be completed on November 1. Thank you for your cooperation.