Densification
Unauthorized and infill construction
Since 2000 the state has taken homes in central Yerevan for development; the ECHR has four times found such takings in breach of the right to property. Unauthorized buildings are legalized by the thousand: 4,258 City Hall decisions in 2019-2024. The national window for registering them, closed in 2021, was reopened to the end of 2026 and then to 30 December 2027.
Facts checked

Photo: Armenian World · Wikimedia Commons · CC0 1.0
How it began
Before. How Yerevan was left without a coherent development strategy after 1991 is covered under 'Master plan & city governance'. This topic is about what got built under those conditions.
What changed. In November 2000 the government approved Northern Avenue, and in 2002 widened the alienation zone to 345,000 m² of Kentron. Homes were taken for state needs, and developers were authorized to negotiate with residents and sue them on the State's behalf.
Timeline
- Origin
The government approves the Northern Avenue project
By Decree No. 774 the government approved the Mayor's Office project for an avenue linking Liberty Square and Republic Square. In July 2001 Decree No. 645 set an alienation zone of 82,700 m² along it for state needs. According to Vardges Shahbazyan, former chief architect of Kentron, the project allowed 6 storeys in the first row and up to 8 in the second and third; the first row now has buildings above 8 storeys.
- Decision
Decision No. 1151-N: 345,000 m² of Kentron marked for alienation
The government widened the Northern Avenue alienation zone to 345,000 m² within the Kentron district: 71,700 m² between Mashtots Avenue and Amiryan and Saryan streets, the 33rd quarter, land by the Grigor Lusavorich church, Kond, and land by the wine factory. In autumn 2004 the mayor promised Kond residents that work on the quarter would not start until the case of the last resident had been studied and discussed. In 2005 residents told Hetq they feared a repeat of Northern Avenue.
Government of Armenia · Yervand Zakharyan
Government Decision No. 1151-N on measures to implement construction programs within the Kentron community of Yerevan — ARLIS, August 1, 2002
Case of Hakobyan and Amirkhanyan v. Armenia (Application no. 14156/07) — European Court of Human Rights, October 17, 2019
Kond is the last neighborhood of old Yerevan — Hetq, April 27, 2005
- Decision
The first law on legalizing unauthorized buildings, for two years
Parliament passed Law HO-510-N on the legal status of unauthorized buildings and unauthorized occupied land. It covered structures registered before 15 May 2001 and was in force from 22 February 2003 to 22 February 2005; its own text limits it to two years.
- Decision
The mayor is allowed to hand out building permits without a tender
Government Decree No. 399-N authorized the mayor to include in compensation offers, in specific cases, construction permits granted "without a tender process through direct negotiations". In June 2004 Decree No. 909-N authorized the mayor to grant such a permit for a section of Byuzand Street, the future Main Avenue, to Glendale Hills. Both decrees are set out in the ECHR judgment in Minasyan and Semerjyan.
- Development
Northern Avenue: about $240 a square meter against a market of $800
The $150 million avenue was funded mainly by foreign private investors. About 500 families were moved out on compensation of roughly $240 per m²; residents valued their land at about $800, and developers were already selling flats at $900-1,500 per m². The Hakobian and Tsovian house, 54 m², was valued at $13,200. A 10% income tax was withheld from the payouts; in 2005 residents demanded it back, about $1.7 million.
- Civic action
Byuzand Street families put up barricades
About a dozen Byuzand Street families resisting eviction blocked the roads to their homes on a Friday; on Tuesday police took the barricades down. City Hall official Karen Davtian put the compensation at $800-1,000 per m²; residents said they had been offered less than half. "People have too high expectations which we can not meet," Davtian said.
- Decision
The Firdusi quarter: 'public interest' and a change of developers
The 33rd quarter redevelopment program (5.5 ha, over $300 million) began in 2006. In 2008 the area was declared an overriding public interest, and the acquirer was City Center Development, linked to former Glendale Hills director Eduard Melikyan. The law lapses a public interest if the project does not start within seven years; in 2018 the acquirer became Dianar, also linked to Melikyan. The land was split into 18 lots among 18 companies named after places in Western Armenia.
- Legal
Constitutional Court: alienation must be set by law
WinOn a petition by Human Rights Defender Armen Harutyunyan, the court found Article 218 of the Civil Code, Articles 104, 106 and 108 of the Land Code, and Decision No. 1151-N unconstitutional. In the court's words, the Constitution "directly requires the expropriation procedure to be prescribed by law". The provisions lost force no later than 1 October 2006; the government voided Decision No. 1151-N on 17 May 2007.
Human Rights Defender of Armenia · Government of Armenia
Constitutional Court Decision DCC-630 on Civil Code Article 218, Land Code Articles 104, 106 and 108, and Government Decision No. 1151-N — ARLIS, April 18, 2006
Decision DCC-630, the court's English text — Constitutional Court of Armenia, April 18, 2006
Government Decision No. 611-N voiding Decision No. 1151-N of 1 August 2002 — ARLIS, May 17, 2007
- Media
The chief seismologist: towers too close and too tall
Alvaro Antonian, head of the National Survey for Seismic Protection, said new high-rises were often disproportionately tall and too close to older buildings, and few went through his agency's examination. "Today the construction industry prefers quick profits," he said; of developers' claims of seismic safety: "Those are just advertisements."
- Legal
ECHR: the taking of a flat on Byuzand Street was unlawful
WinA 26 m² flat at 9 Byuzand Street was taken on a claim by Glendale Hills, which the district court granted in February 2005. The European Court unanimously found the taking "incompatible with the principle of lawfulness" and a breach of the right to property. Three more judgments against Armenia over clearances in the center followed, in 2010, 2012 and 2019.
Glendale Hills · Government of Armenia
Case of Minasyan and Semerjyan v. Armenia (Application no. 27651/05) — European Court of Human Rights, June 23, 2009
Case of Hovhannisyan and Shiroyan v. Armenia (Application no. 5065/06) — European Court of Human Rights, July 20, 2010
Case of Tunyan and Others v. Armenia (Application no. 22812/05) — European Court of Human Rights, October 9, 2012
Case of Hakobyan and Amirkhanyan v. Armenia (Application no. 14156/07) — European Court of Human Rights, October 17, 2019
- Decision
Dalma Gardens: land for a road, without a tender
By Decision No. 271-A the government gave Sahakyanshin land in the Dalma Gardens, without a tender, in exchange for a new Monte Melkonyan Street from Leningradyan to Isakov; the road was priced at 3.5, then 7.9 billion dram, and settled at 6.4. Back in 2003 the strip between Monte Melkonyan Street and Tsitsernakaberd had been moved out of the protected area into a mixed-development zone. In August 2019 Mayor Hayk Marutyan issued a design brief for 6.4 ha: 2,704 flats, about 9,000 residents, up to 15 storeys. By July 2020 there was a foundation permit for one block only, while foundations for the whole complex were being dug.
- Development
The Covered Market: its arched roof comes down right after privatization
The 1950s market is on the Culture Ministry's list of monuments. Businessman and Republican Party MP Samvel Aleksanian "secured no such authorization when he began demolishing the building's arched roof" in May 2012, shortly after privatizing it. It now houses a Yerevan City supermarket.
- Development
A building under construction collapses on Khanjyan Street
The collapse of an unfinished building in central Yerevan injured 11 workers. The construction license issued to two private firms in 2009 had expired, and both firms had recently been fined. Mayor Taron Margaryan said the building had gone up without the permission of City Hall and the city construction inspectorate; civic groups replied that it had repeatedly been reported to City Hall, and demanded proceedings against mayors Zakharyan, Beglaryan, Karapetyan and Margaryan himself.
- Civic action
The Afrikyan house at 11 Teryan Street is taken apart for a hotel
The late-19th-century house had been declared an overriding public interest and bought by Millennium Construction, which planned to rebuild the facade elsewhere in the city and put a hotel on the site. The government had approved the demolition in 2008. Activists tore down the hoarding and erased the numbers on the stones; police detained Vahagn Gevorgyan. The house was brought down in 2014.
- Development
A Kond design competition is in preparation; residents expect little
OngoingDeputy Prime Minister Tigran Avinyan's office and the Urban Development Committee were preparing to announce a sketch-design competition for the quarter. Architect Sergo Tonoyan: under no government has any old part of Yerevan been restored without changing it beyond recognition or tearing down old and valuable buildings. In February 2024 the first stage closed with 7 proposals; in June 2026 Nikol Pashinyan asked for a clear action plan for Kond.
Tigran Avinyan · Urban Development Committee of Armenia
Kond residents have no hope their neighborhood's problems will be solved soon — Azatutyun (RFE/RL), January 21, 2021
Kond will be rebuilt into a more comfortable tourist zone — Armenpress, February 29, 2024
Pashinyan urges clear action plan for redevelopment of historic Kond neighborhood in Yerevan — Armenpress, June 26, 2026
- Civic action
Fizgorodok: 12 storeys in a park, a hunger strike and arrests
At 6/1 Alikhanyan Brothers Street, Ratko LLC was building a 12-storey block. The mayor's urban development council approved the design brief on 15 June 2020, City Hall issued it to Ratko on 20 July, and the building permit followed on 29 July 2021. On 22 August 2021 the Environment Ministry halted the works for lack of an environmental impact assessment, and they resumed in mid-September. Resident Hayk Harutyunyan went on hunger strike, and the privatization of the plot was under criminal investigation. Ten Council members told protesters they were not authorized to stop the construction.
Ministry of Environment of Armenia · Yerevan Municipality
Construction halted in Yerevan's 'Phys-Gorodok' after violent police dispersal — OC Media, August 23, 2021
Hunger striker from Yerevan's Phys-Gorodok stops drinking water — OC Media, September 14, 2021
In Yerevan, police detain five opponents of construction in a park — Caucasian Knot, September 14, 2021
A strangely complicated architect: Meschian's promises during the two years vs. reality — FIP.am, August 21, 2020
A high-rise in the Physics Institute settlement: residents against the developer — Hetq, July 24, 2020
High-rise construction in Yerevan's Fizgorodok sparks protest and scuffles; people detained — Azatutyun (RFE/RL), August 21, 2021
- Decision
The Civil Code: unauthorized structures can no longer be legalized, Yerevan gets until 2023
Law HO-397-N, in force from 6 January 2022, wrote into Article 188 of the Civil Code that an unauthorized structure cannot be recognized as lawful and is subject to demolition. Structures built in Yerevan before 1 January 2021 got a window until 1 January 2023. Justice Minister Karen Andreasyan said the law "will set a date after which illegal buildings will not be legalized".
- Development
Tsitsernakaberd Highway collapses beside the Dalma Gardens construction site
The collapsed section was closed for over two weeks. City Hall spokesman Levon Sardaryan blamed Sahakyanshin for not securing the nearby ground; the company blamed wet weather. Vardges Shahbazyan says a temporary retaining wall was put in where a permanent one was needed. The land under the housing had earlier been rezoned from green to residential.
- Legal
A suit to confiscate AMD 16.8 billion from Gagik Beglaryan: 11 properties on Northern Avenue
OngoingThe Anti-Corruption Court accepted the prosecutors' suit against the former mayor and three family members: 33 flats, premises and buildings in Yerevan, 11 of them on Northern Avenue. In November 2025 prosecutors filed a new suit and said the 2022 case was still being heard.
Prosecutor's Office · Gagik Beglaryan
Petition to confiscate 16.8 billion dram of illicit property and assets from Gagik Beglaryan accepted for proceedings — News.am, June 28, 2022
The Prosecutor's Office demands to confiscate from Gagik Beglaryan property of allegedly illicit origin worth 16.8 Billion AMD — Iravaban.net, April 3, 2023
The Prosecutor General's Office has filed a new suit against Gagik Beglaryan — Iravaban.net, November 24, 2025
- Update
City Hall: 4,258 legalization decisions in 2019-2024
Narek Barseghyan, head of City Hall's architecture department, reported 945 decisions on unauthorized structures on municipal land and 3,313 on private land, and about 9.1 billion dram paid into the budget. Revenue line 1352 in the budget execution reports for the same years adds up to 4.165 billion. Decisions fell in 2024 because the new master plan made legalization on public land effectively impossible. Tigran Avinyan: "We almost effortlessly sign all applications for houses" built without permission on private land. In 2011 architect Gurgen Musheghyan had said each revision of the master plan takes in every violation already committed.
- Update
64 Mikoyan Street: the mayor rules out building on 4,000 m²
The developer of a multifunctional residential complex in Davtashen had gone bankrupt. Tigran Avinyan assured residents that building on the separated plot of about 4,000 m² is excluded, among other reasons because of the restrictions in the 2024 master plan.
- Civic action
Nor Nork: 18 storeys on a children's playground taken off the agenda
OngoingResidents protested at City Hall against an 18-storey block on the site of a children's playground. Activist Artur Chakhoyan: of four public discussions, three ended in a negative conclusion. At the start of its session the Council of Elders took the preliminary permit off the agenda, on a motion by Republic faction head Ani Khachatryan.
- Decision
Law HO-489-N: registering unauthorized structures until the end of 2026
In force from 30 December 2025, the law opened a new window: documents go to the Cadastre Committee by 31 December 2026. On private land, the structure must show on the 2021 orthophotos; structures on state or community land qualify without that test but may not then be alienated to private persons. This is national cadastral registration, separate from City Hall's legalization fees. Yerevan's previous deadline was the end of 2022; Cadastre head Suren Tovmasyan said about 70,000 structures had been entered and the aim now was about 7,000 more.
- Milestone
The government approves Yerevan Downtown on the site of Noragyugh
OngoingAbout 155 buildings for 65,000 residents, 81-83 ha, towers up to 70 storeys, about 10 years of work. The government authorized the mayor to sign contracts with DT Construction and DT Development, which will operate the project and may not take part in the construction itself. Both are wholly owned by Eduard Melikyan, former director of the bankrupt Glendale Hills and owner of about 99% of Dianar. Owners are promised market value plus 30%.
Government of Armenia · Tigran Avinyan · DT Development / DT Construction · Eduard Melikyan
- Decision
The alienation law: 20% on top of the deposit, 30% off for unsafe buildings
Law HO-28-N, in force from 17 February 2026, amended the 2006 alienation law: the deposit is the equivalent compensation plus an additional 20%. For unsafe apartment buildings the value is reduced by 30%. Unregistered unauthorized structures are left out of the valuation.
- Decision
Law HO-331-N: a new window to 30 December 2027, open to late builds too
In force from 18 July 2026, the law lets wholly unauthorized structures on private land, including those built after the earlier cut-off, be registered with the Cadastre Committee and submitted to the Ministry of Territorial Administration and Infrastructure until 30 December 2027, for a government-approved list of structures eligible for legalization. Legalization follows payment of the local duty. This, too, is a national procedure.
- Decision
Demolition within a month on the community head's demand, with no court injunctions
Two laws took effect on 30 August 2026. HO-405-N: an unlegalized structure on private land must be demolished by its owner, at the owner's expense, within a month of a written demand from the community head. HO-398-N: in disputes over legalizing or demolishing structures on community land, or state land within a community, a court may not secure the claim by barring demolition; such existing measures are deemed lifted.
Photographs

15 March 2002, Yerevan. Single-storey shops, cars on the square and a crane over an unfinished building behind. The photographer's note says this is now the start of Northern Avenue.
Photo: Raffi Kojian · Wikimedia Commons · CC BY 4.0

15 March 2002, Abovyan Street. A three-storey tuff house with balconies and shops below. The Commons description says this is now the Hotel Alexander.
Photo: Raffi Kojian · Wikimedia Commons · CC BY 4.0

29 April 2006. Northern Avenue under construction: an excavation, five tower cranes and blocks rising behind them.
Photo: 517design · Wikimedia Commons · CC BY-SA 4.0

31 January 2008. Northern Avenue: a pedestrian street between matching blocks of beige tuff, snow on the paving.
Photo: 23artashes · Wikimedia Commons · CC BY-SA 4.0

14 April 2011, Northern Avenue. A banner on the facade of an apartment block. The Commons description says the block was slated for demolition under an eminent-domain decision and the banner reads "State Needs", "Yes to Renovation", "No to Demolition".
Photo: Արշավիր · Wikimedia Commons · CC0 1.0

15 April 2014, the corner of Yeznik Koghbatsi and Pavstos Buzand streets. An old stone and brick house with a high-rise apartment block directly behind it.
Photo: aurdur · Wikimedia Commons · CC BY-SA 2.0

23 March 2017. Kond: dense low housing in the foreground, taller blocks behind it and the city to the horizon.
Photo: Armineaghayan · Wikimedia Commons · CC BY-SA 4.0

28 June 2017, Pavstos Buzand Street at Kochinyan Street. The fallen wall of a clay house behind a construction hoarding, with a high-rise being finished beside it.
Photo: Preacher lad · Wikimedia Commons · CC BY-SA 4.0

18 May 2024. A view south-southwest from Tsitsernakaberd: Dalma Garden Mall and high-rise apartment blocks at left, Ararat in the distance.
Photo: Yuri Samoylov · Wikimedia Commons · CC BY-SA 4.0

17 June 2024, Kond. Two residential towers rise behind a church and the tin roofs of old houses.
Photo: Dor Shabashewitz · Wikimedia Commons · CC BY 4.0

15 July 2024, Kond. The slate roof and stone wall of an old house against the Seven Visions hotel and a tower in scaffolding.
Photo: Well-read MountainMan · Wikimedia Commons · CC BY-SA 4.0
How much the city takes in
Executed revenue on line 1352, 'Payments for legalizing buildings and structures erected without authorization in the community's administrative area', from the annual budget execution reports, in 2025 prices by Armstat's consumer price index.
In 2025 prices that is 322 million dram in 2010 and 285 million in 2025; its share of all city revenue was 0.4% and 0.2%.
The line's number and wording are the same in every report from 2010 to 2025, so the years compare like for like.
Line 1352, 2010-2025, in 2025 prices
Million dram in 2025 prices.
Sources: Yerevan for People, Armstat
yfp.am/en/topics/densification#budget-line-chart
Every year (16)
| Year | Million dram, that year's prices | Million dram, 2025 prices | Share of revenue |
|---|---|---|---|
| 2010 | 200 | 322 | 0.4% |
| 2011 | 313 | 468 | 0.6% |
| 2012 | 326 | 475 | 0.6% |
| 2013 | 300 | 413 | 0.5% |
| 2014 | 432 | 577 | 0.6% |
| 2015 | 292 | 376 | 0.4% |
| 2016 | 287 | 375 | 0.4% |
| 2017 | 338 | 437 | 0.5% |
| 2018 | 234 | 295 | 0.3% |
| 2019 | 566 | 705 | 0.8% |
| 2020 | 679 | 835 | 0.9% |
| 2021 | 836 | 960 | 1.0% |
| 2022 | 1,066 | 1,126 | 1.2% |
| 2023 | 576 | 597 | 0.5% |
| 2024 | 441 | 456 | 0.4% |
| 2025 | 285 | 285 | 0.2% |
Housing commissioned
The total floor area of residential buildings put into operation in Yerevan each year, from table IC-co-1-2024 of Armstat's statistical bank. The table splits the area by who paid for it; the chart picks out the part built with organizations' funds.
In 2006, 314 thousand m² was put into operation, 21% of it built with organizations' funds. In 2024 it was 1,009 thousand m², 90% of it built with organizations' funds.
Housing put into operation in Yerevan, 2006-2024
Thousand square metres of total floor area per year.
Source: Armstat
yfp.am/en/topics/densification#housing-commissioned-chart
Every year (19)
| Year | Total, m² | Organizations' funds, m² | Population's funds, m² | Organizations' share |
|---|---|---|---|---|
| 2006 | 314,314 | 65,082 | 247,334 | 21% |
| 2007 | 419,742 | 64,342 | 305,000 | 15% |
| 2008 | 437,968 | 124,668 | 300,500 | 28% |
| 2009 | 363,879 | 88,962 | 266,896 | 24% |
| 2010 | 311,552 | 145,904 | 157,662 | 47% |
| 2011 | 487,850 | 416,230 | 59,865 | 85% |
| 2012 | 164,560 | 69,893 | 75,300 | 42% |
| 2013 | 208,933 | 93,387 | 104,600 | 45% |
| 2014 | 220,554 | 124,054 | 96,500 | 56% |
| 2015 | 213,740 | 124,300 | 82,200 | 58% |
| 2016 | 156,517 | 88,917 | 67,600 | 57% |
| 2017 | 145,271 | 81,520 | 58,272 | 56% |
| 2018 | 224,159 | 152,952 | 71,207 | 68% |
| 2019 | 209,818 | 130,718 | 79,100 | 62% |
| 2020 | 223,103 | 162,703 | 53,040 | 73% |
| 2021 | 338,320 | 267,592 | 70,728 | 79% |
| 2022 | 314,692 | 167,180 | 147,512 | 53% |
| 2023 | 561,182 | 474,205 | 86,977 | 85% |
| 2024 | 1,009,405 | 909,215 | 100,190 | 90% |
Data retrieved: October 18, 2026
Apartment prices by district
The average market price of a square metre of a flat in an apartment building, by Yerevan administrative district, in 2024 prices by Armstat's consumer price index. Nork-Marash is not in the sources' tables.
In 2024 prices, a square metre in Kentron cost 506 thousand dram in 2004 and 906 thousand in 2024. The cheapest district in 2024 was Nubarashen: 88 thousand dram in 2004 and 230 thousand in 2024.
Apartment price per square metre in Yerevan by district, 2004-2024
Thousand dram per m² in 2024 prices, restated by Armstat's consumer price index.
The real estate market of the Republic of Armenia: annual analyses, 2005-2015 — Cadastre Committee
Yerevan, Capital of the Republic of Armenia, in Figures, 2020: social sphere — Armstat
Yerevan, Capital of the Republic of Armenia, in Figures, 2020-2024 — Armstat, November 28, 2025
Consumer price index Republic of Armenia 1950-2025 — Armstat
Sources: Cadastre Committee, Armstat
yfp.am/en/topics/densification#apartment-prices-chart
Every year, in that year's prices (21)
Dram per m² as the sources print them, not restated.
| Year | Kentron | Arabkir | Kanaker-Zeytun | Nor Nork | Avan | Erebuni | Shengavit | Davtashen | Ajapnyak | Malatia-Sebastia | Nubarashen |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 2004 | 246,500 | 193,900 | 119,200 | 101,700 | 97,000 | 96,500 | 110,600 | 120,900 | 109,500 | 108,600 | 43,000 |
| 2005 | 288,900 | 235,300 | 143,700 | 135,100 | 122,800 | 118,800 | 143,900 | 147,100 | 138,400 | 134,500 | 69,600 |
| 2006 | 377,600 | 298,200 | 186,100 | 171,100 | 156,200 | 155,800 | 182,700 | 189,400 | 171,800 | 166,800 | 108,000 |
| 2007 | 448,300 | 360,300 | 266,600 | 229,300 | 220,500 | 227,300 | 241,700 | 250,100 | 234,600 | 223,400 | 125,900 |
| 2008 | 483,300 | 403,400 | 305,700 | 270,700 | 268,900 | 269,800 | 277,900 | 292,200 | 271,800 | 260,500 | 154,500 |
| 2009 | 471,600 | 358,600 | 276,300 | 230,800 | 232,800 | 247,100 | 241,900 | 261,100 | 235,900 | 226,400 | 141,800 |
| 2010 | 462,900 | 377,400 | 285,700 | 236,000 | 240,300 | 248,700 | 250,900 | 272,300 | 235,900 | 239,300 | 146,600 |
| 2011 | 441,200 | 343,800 | 266,000 | 226,600 | 238,400 | 234,000 | 230,700 | 257,500 | 224,500 | 222,600 | 146,200 |
| 2012 | 411,900 | 341,300 | 268,900 | 232,300 | 241,600 | 237,700 | 237,900 | 261,800 | 229,300 | 227,000 | 141,100 |
| 2013 | 427,000 | 355,100 | 281,900 | 249,800 | 258,400 | 248,100 | 253,900 | 273,500 | 246,600 | 239,500 | 150,900 |
| 2014 | 428,000 | 356,600 | 282,700 | 252,500 | 260,200 | 250,800 | 256,300 | 275,200 | 249,500 | 242,200 | 155,600 |
| 2015 | 428,000 | 356,600 | 282,700 | 253,300 | 260,700 | 252,000 | 257,150 | 275,900 | 250,100 | 243,300 | 156,750 |
| 2016 | 428,100 | 357,200 | 283,100 | 254,200 | 261,700 | 252,400 | 257,700 | 276,800 | 251,000 | 244,100 | 157,400 |
| 2017 | 445,800 | 345,800 | 270,600 | 237,000 | 251,500 | 240,100 | 244,600 | 257,900 | 234,200 | 233,800 | 157,100 |
| 2018 | 529,200 | 370,500 | 277,500 | 242,800 | 257,200 | 252,800 | 253,400 | 286,700 | 251,100 | 240,500 | 165,400 |
| 2019 | 607,400 | 415,100 | 306,200 | 267,700 | 273,900 | 270,500 | 275,750 | 318,900 | 286,100 | 266,300 | 177,300 |
| 2020 | 644,800 | 452,000 | 328,500 | 293,500 | 288,200 | 300,000 | 335,200 | 313,600 | 289,600 | 295,600 | 183,100 |
| 2021 | 633,000 | 455,200 | 327,500 | 301,500 | 295,700 | 290,900 | 306,700 | 325,600 | 314,800 | 292,500 | 180,100 |
| 2022 | 737,800 | 522,100 | 381,600 | 325,200 | 332,500 | 335,000 | 337,500 | 382,700 | 354,100 | 333,050 | 201,200 |
| 2023 | 837,700 | 587,850 | 405,300 | 358,800 | 371,400 | 365,500 | 428,300 | 378,800 | 365,800 | 364,600 | 214,200 |
| 2024 | 905,600 | 637,300 | 436,900 | 399,000 | 407,100 | 399,400 | 476,700 | 410,500 | 390,700 | 398,300 | 229,900 |
Promises & what happened
- Arthur Meschian — Yerevan chief architect (2018-2020), Yerevan MunicipalityBroken
«"An end to illegal construction! An end to land grabs! There will be no legalization! Do not create problems": Yerevan's chief architect Arthur Meschian in November 2018.»
Said: November 7, 2018 · JAMnewsChecked: October 18, 2026In 2019-2024 City Hall issued 945 legalization decisions for unauthorized structures on municipal land and 3,313 on private land. The community land near the Russia mall where Narek LLC had built illegally was sold to it. Meschian told Fizgorodok residents no high-rise would go up there; in July 2020 City Hall gave Ratko a design brief for a 12-storey block.
- Hayk Marutyan — Mayor of Yerevan (2018-2021), Yerevan MunicipalityPartial
«"Any illegal construction must be stopped immediately, without negotiations, requests or finding some mutual relations."»
Said: November 9, 2018 · Yerevan MunicipalityChecked: October 18, 2026Demolitions rose: about 484 unauthorized structures in three years, 205 in January-August 2021 alone, about 2.5 times the 2016 figure. In 2024 City Hall was demolishing buildings on community land in Ajapnyak: two of the builders were unknown, and the rest had not stopped despite warnings.
- Government of ArmeniaBroken
«The package "will end the legalization of illegally constructed buildings"; Justice Minister Karen Andreasyan: it "will set a date after which illegal buildings will not be legalized".»
The window has been reopened twice: Law HO-489-N gave one until 31 December 2026, and Law HO-331-N added another until 30 December 2027, including for structures built after the earlier cut-off.
- Yerevan MunicipalityPending
«Create a new forest park on 200 ha of the Dalma Gardens: a forest zone, sports and children's grounds, a water body.»
Said: August 28, 2023 · ArmenpressChecked: October 18, 2026The area has grown in City Hall's statements: 200 ha in 2023, up to 230 ha in 2025, 250 ha from Tigran Avinyan in January 2026. A designer was to be picked by autumn 2025; expressions of interest under the ADB loan closed in January 2026, with work tentatively from May 2026. As of 19 October 2026 no contract for this design is among those awarded under the loan: the two signed on 25 May 2026 cover the Isakov-Arshakunyats road and the supervision of it and of Komitas Park. Sahakyanshin's plot lies in the strip taken out of the protected area back in 2003.
Programs Discussed During This Week's Work Meeting — Yerevan Municipality, June 16, 2025
Request for expressions of interest: concept and detailed design services for Komitas Park and Dalma Urban Forest — Yerevan Municipality, December 22, 2025
Yerevan Urban Development Investment Project (54172-002): tenders and contracts awarded — Asian Development Bank
Armenia Approves New Downtown Yerevan Project, Transforming Noragyugh Into a Global Hub With 70-Story Skyscrapers Planned — Zartonk Media, January 29, 2026
Claims & fact-check
- Narek Barseghyan — Head of the Architecture and Urban Development Department, Yerevan MunicipalityDisputed
«About 9.1 billion dram was transferred to the Yerevan budget from legalizing unauthorized buildings in 2019-2024.»
In fact: Revenue line 1352, payments for legalizing unauthorized buildings, by actual execution: 2019 566.3 million, 2020 678.9, 2021 836.1, 2022 1,066.0, 2023 576.4, 2024 441.4 million dram; 4.165 billion in all. In 2025: 285.0 million. Where the other 4.9 billion came from is not explained.
Said: March 3, 2025 · ARKAChecked: October 18, 2026 - Yerevan MunicipalityMisleading
«"There will be no illegal buildings or occupied territories in Yerevan: this is an important principle that the Municipality is guided by."»
In fact: The same page says the buildings on community land in Ajapnyak went up within months and their builders kept going after warnings. In 2019-2024 City Hall legalized unauthorized structures on municipal land 945 times, and Law HO-489-N lets structures on state and community land be registered without the 2021 aerial-photo test.
Said: July 24, 2024 · Yerevan MunicipalityChecked: October 18, 2026 - Taron Margaryan — Mayor of Yerevan (2011-2018)Misleading
«The collapsed building at 20 Khanjyan Street was built without the permission of City Hall and the city construction inspectorate.»
In fact: The two owning firms had a construction license issued in 2009; it had expired, and both firms had recently been fined. Civic groups say the site had repeatedly been reported to City Hall.
Said: October 30, 2012 · Caucasian KnotChecked: October 18, 2026
Red flags
- Below-market compensation
Northern Avenue residents were paid about $240 per m²; they valued their land at about $800, and developers were selling at $900-1,500 per m².
- Opaque tender
Decree No. 399-N let the mayor include construction permits in compensation offers without a tender, through direct negotiations.
- Opaque tender
Land in the Dalma Gardens was exchanged for a road without a tender (Decision No. 271-A); the Finance and Territorial Administration ministries objected to the lack of one.
- Rezoning
A 2003 decision cut the protected Dalma Gardens area from 700 to 256 ha and made the strip by Tsitsernakaberd a mixed-development zone; the 2005 master plan showed its part along Leningradyan Street as public green space.
- Unauthorized construction
In July 2020 Sahakyanshin was digging foundations for the whole complex on a foundation permit for one block.
- Unauthorized construction
The building at 20 Khanjyan Street went up on an expired 2009 license; its collapse injured 11 workers.
- Skipped process
Ratko started the 12-storey block in Fizgorodok without the mandatory environmental impact assessment; the Environment Ministry halted the works on 22 August 2021, and they restarted three weeks later.
- Unauthorized construction
In 2019-2024 City Hall made 945 decisions legalizing unauthorized structures on municipal land and 3,313 on private land.
Litigation
- Constitutional CourtFinalClaimant wonCase no. ՍԴՈ-630
Human Rights Defender of Armeniav.Government of Armenia
Whether Civil Code Article 218, Land Code Articles 104, 106 and 108, and Government Decision No. 1151-N on alienation in Kentron comply with the Constitution.
Decided: April 18, 2006All the provisions were found unconstitutional; the alienation procedure must be set by law. Decision No. 1151-N was voided in 2007.
Constitutional Court Decision DCC-630 on Civil Code Article 218, Land Code Articles 104, 106 and 108, and Government Decision No. 1151-N — ARLIS, April 18, 2006
Decision DCC-630, the court's English text — Constitutional Court of Armenia, April 18, 2006
Government Decision No. 611-N voiding Decision No. 1151-N of 1 August 2002 — ARLIS, May 17, 2007
- European Court of Human RightsFinalClaimant wonCase no. 27651/05
Minasyan and Semerjyanv.Government of Armenia
The taking of a 26 m² flat at 9 Byuzand Street on a claim brought by Glendale Hills on behalf of the State.
Decided: June 23, 2009Violation of Article 1 of Protocol No. 1 (protection of property), unanimously.
- European Court of Human RightsFinalClaimant wonCase no. 5065/06
Hovhannisyan and Shiroyanv.Government of Armenia
The loss of a right of use in a flat at 17 Byuzand Street, a section given to developer Vizkon Ltd. The district court awarded the equivalent of USD 10,500.
Decided: July 20, 2010Violation of Article 1 of Protocol No. 1, unanimously; the court reserved the question of just satisfaction.
- European Court of Human RightsFinalClaimant wonCase no. 22812/05
Tunyan and Othersv.Government of Armenia
The taking of a flat and leased plot at 9 Byuzand Street, valued for Glendale Hills at USD 34,200.
Decided: October 9, 2012Violation, unanimously: EUR 30,000 to the applicants jointly for pecuniary damage and EUR 1,500 each for non-pecuniary damage.
- European Court of Human RightsFinalClaimant wonCase no. 14156/07
Hakobyan and Amirkhanyanv.Government of Armenia
The taking of property in the Northern Avenue and Kentron zone on a state agency's claim, granted in 2005-2006.
Decided: October 17, 2019Violation, unanimously: EUR 250,000 for pecuniary damage, EUR 6,000 for non-pecuniary damage (by six votes to one), EUR 3,000 in costs.
- Anti-Corruption CourtIn hearingsCase no. ՀԿԴ/0019/02/22
Prosecutor's Officev.Gagik Beglaryan
Confiscation from former mayor Gagik Beglaryan and three family members of property of allegedly illicit origin worth AMD 16.8 billion: 33 properties in Yerevan, 11 on Northern Avenue.
The Yerevan court of general jurisdiction accepted the suit on 7 June 2022, and in September the case went to the Anti-Corruption Court (Judge Narine Avagyan). The court refused the Beglaryans' counterclaim, and the appeals court upheld that in December 2023. Preliminary hearings ran for two years, and the trial on the merits has been under way since 10 December 2024. In the datalex.am registry the last hearing held was on 14 September 2026, with the next set for 16 October; there is no judgment.
Petition to confiscate 16.8 billion dram of illicit property and assets from Gagik Beglaryan accepted for proceedings — News.am, June 28, 2022
The Prosecutor's Office demands to confiscate from Gagik Beglaryan property of allegedly illicit origin worth 16.8 Billion AMD — Iravaban.net, April 3, 2023
The Prosecutor General's Office has filed a new suit against Gagik Beglaryan — Iravaban.net, November 24, 2025
Prosecutor General v. Gagik, Nune, Hrant and Natella Beglaryan: hearings and acts in the case — DataLex
Money
- 9.1 billion AMDBudget revenue
Budget receipts from legalizing unauthorized buildings in 2019-2024, as stated by Narek Barseghyan of City Hall.
March 3, 2025Narek Barseghyan - 4.2 billion AMDBudget revenue
Line 1352, payments for legalizing unauthorized buildings and structures, by actual execution in 2019-2024.
Connections
What we don't know yet
- What makes up the AMD 9.1 billion from legalization in 2019-2024 that Narek Barseghyan cited? Budget line 1352 (legalization payments) adds up to 4.165 billion for the same years. But under Government Decision No. 912-N, City Hall does not legalize a structure on municipal land for a fee: it sells it to the builder at 10 to 90 times the base duty per m², together with the land at cadastral value, and that money does not go to line 1352. Land sales in the budget execution reports (49.5 billion over the six years) are not broken down by reason, so the reports cannot show what the 945 decisions on municipal land brought in.
- How will the suit to confiscate AMD 16.8 billion from Gagik Beglaryan end? It was filed in 2022 and has been tried on the merits since December 2024, with no judgment as of October 2026.
- Who will get the contract for the concept and detailed design of the Dalma forest park (ADB estimate: $800,000), and when? Expressions of interest closed in January 2026, and as of 19 October 2026 it is not on the list of contracts awarded under the ADB loan.
Sources
- Decision DCC-630, the court's English textConstitutional Court of Armeniaarchive · June 7, 2026
- Case of Hakobyan and Amirkhanyan v. Armenia (Application no. 14156/07)European Court of Human Rightsarchive · November 2, 2026
- Case of Minasyan and Semerjyan v. Armenia (Application no. 27651/05)European Court of Human Rightsarchive · January 13, 2025
- Case of Hovhannisyan and Shiroyan v. Armenia (Application no. 5065/06)European Court of Human Rightsarchive · November 2, 2026
- Case of Tunyan and Others v. Armenia (Application no. 22812/05)European Court of Human Rightsarchive · November 2, 2026
- The unknown developer of the Firdusi quarterTransparency.am / CivilNetarchive · November 21, 2024
- Building Under Construction Collapses In YerevanAzatutyun (RFE/RL)archive · June 15, 2026
- Programs Discussed During This Week's Work MeetingYerevan Municipalityarchive · February 10, 2026