Densification

Unauthorized and infill construction

Since 2000 the state has taken homes in central Yerevan for development; the ECHR has four times found such takings in breach of the right to property. Unauthorized buildings are legalized by the thousand: 4,258 City Hall decisions in 2019-2024. The national window for registering them, closed in 2021, was reopened to the end of 2026 and then to 30 December 2027.

Facts checked

New buildings in Yerevan's 33rd quarter, July 2025: towers and tower cranes above low roofs and trees

Photo: Armenian World · Wikimedia Commons · CC0 1.0

How it began

Structurally baked in

Before. How Yerevan was left without a coherent development strategy after 1991 is covered under 'Master plan & city governance'. This topic is about what got built under those conditions.

What changed. In November 2000 the government approved Northern Avenue, and in 2002 widened the alienation zone to 345,000 m² of Kentron. Homes were taken for state needs, and developers were authorized to negotiate with residents and sue them on the State's behalf.

Timeline

  1. Origin

    The government approves the Northern Avenue project

    By Decree No. 774 the government approved the Mayor's Office project for an avenue linking Liberty Square and Republic Square. In July 2001 Decree No. 645 set an alienation zone of 82,700 m² along it for state needs. According to Vardges Shahbazyan, former chief architect of Kentron, the project allowed 6 storeys in the first row and up to 8 in the second and third; the first row now has buildings above 8 storeys.

    Government of Armenia · Yerevan Municipality

  2. Decision

    Decision No. 1151-N: 345,000 m² of Kentron marked for alienation

    The government widened the Northern Avenue alienation zone to 345,000 m² within the Kentron district: 71,700 m² between Mashtots Avenue and Amiryan and Saryan streets, the 33rd quarter, land by the Grigor Lusavorich church, Kond, and land by the wine factory. In autumn 2004 the mayor promised Kond residents that work on the quarter would not start until the case of the last resident had been studied and discussed. In 2005 residents told Hetq they feared a repeat of Northern Avenue.

    Government of Armenia · Yervand Zakharyan

  3. Decision

    The first law on legalizing unauthorized buildings, for two years

    Parliament passed Law HO-510-N on the legal status of unauthorized buildings and unauthorized occupied land. It covered structures registered before 15 May 2001 and was in force from 22 February 2003 to 22 February 2005; its own text limits it to two years.

  4. Decision

    The mayor is allowed to hand out building permits without a tender

    Government Decree No. 399-N authorized the mayor to include in compensation offers, in specific cases, construction permits granted "without a tender process through direct negotiations". In June 2004 Decree No. 909-N authorized the mayor to grant such a permit for a section of Byuzand Street, the future Main Avenue, to Glendale Hills. Both decrees are set out in the ECHR judgment in Minasyan and Semerjyan.

    Government of Armenia · Glendale Hills

  5. Development

    Northern Avenue: about $240 a square meter against a market of $800

    The $150 million avenue was funded mainly by foreign private investors. About 500 families were moved out on compensation of roughly $240 per m²; residents valued their land at about $800, and developers were already selling flats at $900-1,500 per m². The Hakobian and Tsovian house, 54 m², was valued at $13,200. A 10% income tax was withheld from the payouts; in 2005 residents demanded it back, about $1.7 million.

    Government of Armenia · Yervand Zakharyan

  6. Civic action

    Byuzand Street families put up barricades

    About a dozen Byuzand Street families resisting eviction blocked the roads to their homes on a Friday; on Tuesday police took the barricades down. City Hall official Karen Davtian put the compensation at $800-1,000 per m²; residents said they had been offered less than half. "People have too high expectations which we can not meet," Davtian said.

    Yerevan Municipality

  7. Decision

    The Firdusi quarter: 'public interest' and a change of developers

    The 33rd quarter redevelopment program (5.5 ha, over $300 million) began in 2006. In 2008 the area was declared an overriding public interest, and the acquirer was City Center Development, linked to former Glendale Hills director Eduard Melikyan. The law lapses a public interest if the project does not start within seven years; in 2018 the acquirer became Dianar, also linked to Melikyan. The land was split into 18 lots among 18 companies named after places in Western Armenia.

    City Center Development / Dianar · Eduard Melikyan

  8. Legal

    Constitutional Court: alienation must be set by law

    Win

    On a petition by Human Rights Defender Armen Harutyunyan, the court found Article 218 of the Civil Code, Articles 104, 106 and 108 of the Land Code, and Decision No. 1151-N unconstitutional. In the court's words, the Constitution "directly requires the expropriation procedure to be prescribed by law". The provisions lost force no later than 1 October 2006; the government voided Decision No. 1151-N on 17 May 2007.

    Human Rights Defender of Armenia · Government of Armenia

  9. Media

    The chief seismologist: towers too close and too tall

    Alvaro Antonian, head of the National Survey for Seismic Protection, said new high-rises were often disproportionately tall and too close to older buildings, and few went through his agency's examination. "Today the construction industry prefers quick profits," he said; of developers' claims of seismic safety: "Those are just advertisements."

  10. Legal

    ECHR: the taking of a flat on Byuzand Street was unlawful

    Win

    A 26 m² flat at 9 Byuzand Street was taken on a claim by Glendale Hills, which the district court granted in February 2005. The European Court unanimously found the taking "incompatible with the principle of lawfulness" and a breach of the right to property. Three more judgments against Armenia over clearances in the center followed, in 2010, 2012 and 2019.

    Glendale Hills · Government of Armenia

  11. Decision

    Dalma Gardens: land for a road, without a tender

    By Decision No. 271-A the government gave Sahakyanshin land in the Dalma Gardens, without a tender, in exchange for a new Monte Melkonyan Street from Leningradyan to Isakov; the road was priced at 3.5, then 7.9 billion dram, and settled at 6.4. Back in 2003 the strip between Monte Melkonyan Street and Tsitsernakaberd had been moved out of the protected area into a mixed-development zone. In August 2019 Mayor Hayk Marutyan issued a design brief for 6.4 ha: 2,704 flats, about 9,000 residents, up to 15 storeys. By July 2020 there was a foundation permit for one block only, while foundations for the whole complex were being dug.

    Government of Armenia · Sahakyanshin · Hayk Marutyan

  12. Development

    The Covered Market: its arched roof comes down right after privatization

    The 1950s market is on the Culture Ministry's list of monuments. Businessman and Republican Party MP Samvel Aleksanian "secured no such authorization when he began demolishing the building's arched roof" in May 2012, shortly after privatizing it. It now houses a Yerevan City supermarket.

  13. Development

    A building under construction collapses on Khanjyan Street

    The collapse of an unfinished building in central Yerevan injured 11 workers. The construction license issued to two private firms in 2009 had expired, and both firms had recently been fined. Mayor Taron Margaryan said the building had gone up without the permission of City Hall and the city construction inspectorate; civic groups replied that it had repeatedly been reported to City Hall, and demanded proceedings against mayors Zakharyan, Beglaryan, Karapetyan and Margaryan himself.

    Taron Margaryan

  14. Civic action

    The Afrikyan house at 11 Teryan Street is taken apart for a hotel

    The late-19th-century house had been declared an overriding public interest and bought by Millennium Construction, which planned to rebuild the facade elsewhere in the city and put a hotel on the site. The government had approved the demolition in 2008. Activists tore down the hoarding and erased the numbers on the stones; police detained Vahagn Gevorgyan. The house was brought down in 2014.

  15. Development

    A Kond design competition is in preparation; residents expect little

    Ongoing

    Deputy Prime Minister Tigran Avinyan's office and the Urban Development Committee were preparing to announce a sketch-design competition for the quarter. Architect Sergo Tonoyan: under no government has any old part of Yerevan been restored without changing it beyond recognition or tearing down old and valuable buildings. In February 2024 the first stage closed with 7 proposals; in June 2026 Nikol Pashinyan asked for a clear action plan for Kond.

    Tigran Avinyan · Urban Development Committee of Armenia

  16. Civic action

    Fizgorodok: 12 storeys in a park, a hunger strike and arrests

    At 6/1 Alikhanyan Brothers Street, Ratko LLC was building a 12-storey block. The mayor's urban development council approved the design brief on 15 June 2020, City Hall issued it to Ratko on 20 July, and the building permit followed on 29 July 2021. On 22 August 2021 the Environment Ministry halted the works for lack of an environmental impact assessment, and they resumed in mid-September. Resident Hayk Harutyunyan went on hunger strike, and the privatization of the plot was under criminal investigation. Ten Council members told protesters they were not authorized to stop the construction.

    Ministry of Environment of Armenia · Yerevan Municipality

  17. Decision

    The Civil Code: unauthorized structures can no longer be legalized, Yerevan gets until 2023

    Law HO-397-N, in force from 6 January 2022, wrote into Article 188 of the Civil Code that an unauthorized structure cannot be recognized as lawful and is subject to demolition. Structures built in Yerevan before 1 January 2021 got a window until 1 January 2023. Justice Minister Karen Andreasyan said the law "will set a date after which illegal buildings will not be legalized".

    Government of Armenia

  18. Development

    Tsitsernakaberd Highway collapses beside the Dalma Gardens construction site

    The collapsed section was closed for over two weeks. City Hall spokesman Levon Sardaryan blamed Sahakyanshin for not securing the nearby ground; the company blamed wet weather. Vardges Shahbazyan says a temporary retaining wall was put in where a permanent one was needed. The land under the housing had earlier been rezoned from green to residential.

    Sahakyanshin · Yerevan Municipality

  19. Legal

    A suit to confiscate AMD 16.8 billion from Gagik Beglaryan: 11 properties on Northern Avenue

    Ongoing

    The Anti-Corruption Court accepted the prosecutors' suit against the former mayor and three family members: 33 flats, premises and buildings in Yerevan, 11 of them on Northern Avenue. In November 2025 prosecutors filed a new suit and said the 2022 case was still being heard.

    Prosecutor's Office · Gagik Beglaryan

  20. Update

    City Hall: 4,258 legalization decisions in 2019-2024

    Narek Barseghyan, head of City Hall's architecture department, reported 945 decisions on unauthorized structures on municipal land and 3,313 on private land, and about 9.1 billion dram paid into the budget. Revenue line 1352 in the budget execution reports for the same years adds up to 4.165 billion. Decisions fell in 2024 because the new master plan made legalization on public land effectively impossible. Tigran Avinyan: "We almost effortlessly sign all applications for houses" built without permission on private land. In 2011 architect Gurgen Musheghyan had said each revision of the master plan takes in every violation already committed.

    Narek Barseghyan · Tigran Avinyan

  21. Update

    64 Mikoyan Street: the mayor rules out building on 4,000 m²

    The developer of a multifunctional residential complex in Davtashen had gone bankrupt. Tigran Avinyan assured residents that building on the separated plot of about 4,000 m² is excluded, among other reasons because of the restrictions in the 2024 master plan.

    Tigran Avinyan

  22. Civic action

    Nor Nork: 18 storeys on a children's playground taken off the agenda

    Ongoing

    Residents protested at City Hall against an 18-storey block on the site of a children's playground. Activist Artur Chakhoyan: of four public discussions, three ended in a negative conclusion. At the start of its session the Council of Elders took the preliminary permit off the agenda, on a motion by Republic faction head Ani Khachatryan.

    Yerevan Municipality

  23. Decision

    Law HO-489-N: registering unauthorized structures until the end of 2026

    In force from 30 December 2025, the law opened a new window: documents go to the Cadastre Committee by 31 December 2026. On private land, the structure must show on the 2021 orthophotos; structures on state or community land qualify without that test but may not then be alienated to private persons. This is national cadastral registration, separate from City Hall's legalization fees. Yerevan's previous deadline was the end of 2022; Cadastre head Suren Tovmasyan said about 70,000 structures had been entered and the aim now was about 7,000 more.

    Government of Armenia

  24. Milestone

    The government approves Yerevan Downtown on the site of Noragyugh

    Ongoing

    About 155 buildings for 65,000 residents, 81-83 ha, towers up to 70 storeys, about 10 years of work. The government authorized the mayor to sign contracts with DT Construction and DT Development, which will operate the project and may not take part in the construction itself. Both are wholly owned by Eduard Melikyan, former director of the bankrupt Glendale Hills and owner of about 99% of Dianar. Owners are promised market value plus 30%.

    Government of Armenia · Tigran Avinyan · DT Development / DT Construction · Eduard Melikyan

  25. Decision

    The alienation law: 20% on top of the deposit, 30% off for unsafe buildings

    Law HO-28-N, in force from 17 February 2026, amended the 2006 alienation law: the deposit is the equivalent compensation plus an additional 20%. For unsafe apartment buildings the value is reduced by 30%. Unregistered unauthorized structures are left out of the valuation.

    Government of Armenia

  26. Decision

    Law HO-331-N: a new window to 30 December 2027, open to late builds too

    In force from 18 July 2026, the law lets wholly unauthorized structures on private land, including those built after the earlier cut-off, be registered with the Cadastre Committee and submitted to the Ministry of Territorial Administration and Infrastructure until 30 December 2027, for a government-approved list of structures eligible for legalization. Legalization follows payment of the local duty. This, too, is a national procedure.

    Government of Armenia

  27. Decision

    Demolition within a month on the community head's demand, with no court injunctions

    Two laws took effect on 30 August 2026. HO-405-N: an unlegalized structure on private land must be demolished by its owner, at the owner's expense, within a month of a written demand from the community head. HO-398-N: in disputes over legalizing or demolishing structures on community land, or state land within a community, a court may not secure the claim by barring demolition; such existing measures are deemed lifted.

    Government of Armenia

Photographs

A square with single-storey shops and parked cars, a crane over an unfinished building behind them and a painted fence

15 March 2002, Yerevan. Single-storey shops, cars on the square and a crane over an unfinished building behind. The photographer's note says this is now the start of Northern Avenue.

Photo: Raffi Kojian · Wikimedia Commons · CC BY 4.0

A three-storey tuff house with balconies and shops on the ground floor, cars along the kerb

15 March 2002, Abovyan Street. A three-storey tuff house with balconies and shops below. The Commons description says this is now the Hotel Alexander.

Photo: Raffi Kojian · Wikimedia Commons · CC BY 4.0

A construction site with a deep excavation, five tower cranes and rising blocks behind them

29 April 2006. Northern Avenue under construction: an excavation, five tower cranes and blocks rising behind them.

Photo: 517design · Wikimedia Commons · CC BY-SA 4.0

A pedestrian street between uniform beige tuff blocks, snow on the paving, a tower at the right edge

31 January 2008. Northern Avenue: a pedestrian street between matching blocks of beige tuff, snow on the paving.

Photo: 23artashes · Wikimedia Commons · CC BY-SA 4.0

A multi-storey apartment block with a banner on its facade and parked cars below

14 April 2011, Northern Avenue. A banner on the facade of an apartment block. The Commons description says the block was slated for demolition under an eminent-domain decision and the banner reads "State Needs", "Yes to Renovation", "No to Demolition".

Photo: Արշավիր · Wikimedia Commons · CC0 1.0

An old stone and brick house with a corrugated roof and a broken arch, with a beige high-rise apartment block directly behind it

15 April 2014, the corner of Yeznik Koghbatsi and Pavstos Buzand streets. An old stone and brick house with a high-rise apartment block directly behind it.

Photo: aurdur · Wikimedia Commons · CC BY-SA 2.0

Rooftops of Kond with dense low housing, taller apartment blocks behind them and the city to the horizon

23 March 2017. Kond: dense low housing in the foreground, taller blocks behind it and the city to the horizon.

Photo: Armineaghayan · Wikimedia Commons · CC BY-SA 4.0

A collapsed clay-walled house behind a construction hoarding, with an unfinished high-rise with blue glazing above it

28 June 2017, Pavstos Buzand Street at Kochinyan Street. The fallen wall of a clay house behind a construction hoarding, with a high-rise being finished beside it.

Photo: Preacher lad · Wikimedia Commons · CC BY-SA 4.0

A view south-southwest from Tsitsernakaberd: a green slope, a plain below with high-rises and a shopping mall, Ararat on the horizon

18 May 2024. A view south-southwest from Tsitsernakaberd: Dalma Garden Mall and high-rise apartment blocks at left, Ararat in the distance.

Photo: Yuri Samoylov · Wikimedia Commons · CC BY-SA 4.0

Two residential towers behind a yellow-tuff church and the tin roofs of old houses in Kond

17 June 2024, Kond. Two residential towers rise behind a church and the tin roofs of old houses.

Photo: Dor Shabashewitz · Wikimedia Commons · CC BY 4.0

A worn slate roof and a stone wall, with a glass hotel building and a tower in scaffolding behind them

15 July 2024, Kond. The slate roof and stone wall of an old house against the Seven Visions hotel and a tower in scaffolding.

Photo: Well-read MountainMan · Wikimedia Commons · CC BY-SA 4.0

How much the city takes in

Executed revenue on line 1352, 'Payments for legalizing buildings and structures erected without authorization in the community's administrative area', from the annual budget execution reports, in 2025 prices by Armstat's consumer price index.

In 2025 prices that is 322 million dram in 2010 and 285 million in 2025; its share of all city revenue was 0.4% and 0.2%.

The line's number and wording are the same in every report from 2010 to 2025, so the years compare like for like.

Line 1352, 2010-2025, in 2025 prices

0200400600800100012002010201520202025

Million dram in 2025 prices.

Every year (16)
YearMillion dram, that year's pricesMillion dram, 2025 pricesShare of revenue
20102003220.4%
20113134680.6%
20123264750.6%
20133004130.5%
20144325770.6%
20152923760.4%
20162873750.4%
20173384370.5%
20182342950.3%
20195667050.8%
20206798350.9%
20218369601.0%
20221,0661,1261.2%
20235765970.5%
20244414560.4%
20252852850.2%

Housing commissioned

The total floor area of residential buildings put into operation in Yerevan each year, from table IC-co-1-2024 of Armstat's statistical bank. The table splits the area by who paid for it; the chart picks out the part built with organizations' funds.

In 2006, 314 thousand m² was put into operation, 21% of it built with organizations' funds. In 2024 it was 1,009 thousand m², 90% of it built with organizations' funds.

Housing put into operation in Yerevan, 2006-2024

020040060080010001200201020152020
TotalOf which organizations' funds

Thousand square metres of total floor area per year.

Every year (19)
YearTotal, m²Organizations' funds, m²Population's funds, m²Organizations' share
2006314,31465,082247,33421%
2007419,74264,342305,00015%
2008437,968124,668300,50028%
2009363,87988,962266,89624%
2010311,552145,904157,66247%
2011487,850416,23059,86585%
2012164,56069,89375,30042%
2013208,93393,387104,60045%
2014220,554124,05496,50056%
2015213,740124,30082,20058%
2016156,51788,91767,60057%
2017145,27181,52058,27256%
2018224,159152,95271,20768%
2019209,818130,71879,10062%
2020223,103162,70353,04073%
2021338,320267,59270,72879%
2022314,692167,180147,51253%
2023561,182474,20586,97785%
20241,009,405909,215100,19090%

Data retrieved: October 18, 2026

Apartment prices by district

The average market price of a square metre of a flat in an apartment building, by Yerevan administrative district, in 2024 prices by Armstat's consumer price index. Nork-Marash is not in the sources' tables.

In 2024 prices, a square metre in Kentron cost 506 thousand dram in 2004 and 906 thousand in 2024. The cheapest district in 2024 was Nubarashen: 88 thousand dram in 2004 and 230 thousand in 2024.

Apartment price per square metre in Yerevan by district, 2004-2024

020040060080010002005201020152020
KentronOther districts

Thousand dram per m² in 2024 prices, restated by Armstat's consumer price index.

Every year, in that year's prices (21)

Dram per m² as the sources print them, not restated.

YearKentronArabkirKanaker-ZeytunNor NorkAvanErebuniShengavitDavtashenAjapnyakMalatia-SebastiaNubarashen
2004246,500193,900119,200101,70097,00096,500110,600120,900109,500108,60043,000
2005288,900235,300143,700135,100122,800118,800143,900147,100138,400134,50069,600
2006377,600298,200186,100171,100156,200155,800182,700189,400171,800166,800108,000
2007448,300360,300266,600229,300220,500227,300241,700250,100234,600223,400125,900
2008483,300403,400305,700270,700268,900269,800277,900292,200271,800260,500154,500
2009471,600358,600276,300230,800232,800247,100241,900261,100235,900226,400141,800
2010462,900377,400285,700236,000240,300248,700250,900272,300235,900239,300146,600
2011441,200343,800266,000226,600238,400234,000230,700257,500224,500222,600146,200
2012411,900341,300268,900232,300241,600237,700237,900261,800229,300227,000141,100
2013427,000355,100281,900249,800258,400248,100253,900273,500246,600239,500150,900
2014428,000356,600282,700252,500260,200250,800256,300275,200249,500242,200155,600
2015428,000356,600282,700253,300260,700252,000257,150275,900250,100243,300156,750
2016428,100357,200283,100254,200261,700252,400257,700276,800251,000244,100157,400
2017445,800345,800270,600237,000251,500240,100244,600257,900234,200233,800157,100
2018529,200370,500277,500242,800257,200252,800253,400286,700251,100240,500165,400
2019607,400415,100306,200267,700273,900270,500275,750318,900286,100266,300177,300
2020644,800452,000328,500293,500288,200300,000335,200313,600289,600295,600183,100
2021633,000455,200327,500301,500295,700290,900306,700325,600314,800292,500180,100
2022737,800522,100381,600325,200332,500335,000337,500382,700354,100333,050201,200
2023837,700587,850405,300358,800371,400365,500428,300378,800365,800364,600214,200
2024905,600637,300436,900399,000407,100399,400476,700410,500390,700398,300229,900

Promises & what happened

Claims & fact-check

Red flags

Litigation

Money

Connections

What we don't know yet

  • What makes up the AMD 9.1 billion from legalization in 2019-2024 that Narek Barseghyan cited? Budget line 1352 (legalization payments) adds up to 4.165 billion for the same years. But under Government Decision No. 912-N, City Hall does not legalize a structure on municipal land for a fee: it sells it to the builder at 10 to 90 times the base duty per m², together with the land at cadastral value, and that money does not go to line 1352. Land sales in the budget execution reports (49.5 billion over the six years) are not broken down by reason, so the reports cannot show what the 945 decisions on municipal land brought in.
  • How will the suit to confiscate AMD 16.8 billion from Gagik Beglaryan end? It was filed in 2022 and has been tried on the merits since December 2024, with no judgment as of October 2026.
  • Who will get the contract for the concept and detailed design of the Dalma forest park (ADB estimate: $800,000), and when? Expressions of interest closed in January 2026, and as of 19 October 2026 it is not on the list of contracts awarded under the ADB loan.